2 1/2" higher than the new floor on the inside. To solve this problem they will remove the rest of the deck boards on the top landing and put 3/4" treated plywood down and lower the new door to the plywood and that would take care of the trip area on the inside. This will be protected by the covered roof and can be carpeted or turfed. Also, they got a lot of drywall up today. It looks really large in there...25' from the patio door to the front!
.jpg)

.jpg)
.jpg)
No comments:
Post a Comment