Like the bathroom tile job, this job of hanging the pine wall boards was much more difficult than we had hoped or even assumed. There were lots of complications, enough so that we needed to take a 2 day break between installing wall number 1 and wall number 2! But once we stepped back and re-thought the idea, walls 2, 3 and 4 went up in two days. So it took three days to put this all up while stopping to do electrical, eat and visit the neighbors! The wood slats were not the quality we thought and that in itself was disappointing. But once up, the room was a pleasurable transformation.

Not an accurate before, but a before after the insulation went up.

During - while putting up the pine boards.

Not quite an after, but the four walls are done, the sconces are in. Of course, the To-Do list just grew a bit longer; we need window treatments, the ceiling needs the wood slats attached, the ceiling fan needs to be installed and then there's the trim work and a carpet....phew....does it ever end????
No comments:
Post a Comment